USAfixTM - Repair Guide (RG) - Master Email RG
- Check the manual valve for leaks
 Level of Difficulty - Low  Estimated Completion Time - 5 minutes
TASKI - SWINGO 750B

Tools Required

Parts Required


Step Procedure & Parts & Tools
1 MOVE LEVER TO OPEN POSITION

2 VISUALLY INSPECT THE MANUAL VALVE FOR LEAKS. MOVE THE SOLUTION LEVER TO THE OFF POSITION